|
|
|
|
|
|
Current
Projects Out To Bid
|
|

|
WANTED
|

|
|
QUOTATIONS
REQUESTED FROM ALL QUALIFIED M/W/S/L/D/DVBE SUBCONTRACTORS &
SUPPLIERS |
|
BID DATE:
08/05/10
BID TIME:
2:00 P.M. |
Project:
Sheriff/DA Evidence Storage Upgrades, San Jose
Scope incl., but
not limited to: Demo/removal/disposal of (E) partitions, doors,
cabinetry, carpet, VCT, ceiling tile, mech. Equip., walk in
freezer, emergency showers & eye washers, electrical, roll up
door, concrete @ new door exit door landing, dark room
equipment, asbestos VCT; AND Construction of: partitions, doors,
hdwe, roll up doors, sealed concrete flooring, concrete plug @
bullet pit & landing @ exit door, light fixtures/switches,
electrical, repair of ceilings, walls, paint, shelving,
emergency lighting/exit signs, sprinkler design/construction,
HVAC, backfill bullet trap area w/plain concrete, fire alarm
system. 21,576 sf.
EST: $1.4
MM Approx. Duration:
270 Days |
Plans & Specs:
Available for purchase from Peninsula Digital Imaging (650)
967-1966
to download plans and specs click below.
(Sheriff/DA
Evidence Storage Plans & Specs) |
|
BID DATE:
08/10/10
BID TIME:
2:00 P.M. |
Project:
Carlmont HS Biotech Bldg., Belmont
New bldg. consists
of 3 biotechnology classrooms, growth rooms, chemical storage
rooms, glass storage rooms & office space. Total sf is approx.
13,000. Scope incl. site utilities, retaining walls, walk ways,
concrete sidewalks, elevator, stairs, ramps, asphalt paving, mod
to (E) parking & driveways, ext. finishes incl. cement plaster over
wood stud framing, cantilevered wood deck w/galvanized metal
guardrails, operable alum. Windows, standing seam metal roof.
Int. finishes incl. carpet, rubber tile flooring, resinous epoxy
& ceramic tile, painted gypsum board, tackable vinyl wall
covering & suspended acoustical tile, AV, HVAC, plumbing, fire
sprinkler, electrical.
EST:
$4.8 MM Approx.
Duration: 10 Mos. |
Plans & Specs:
Available for purchase from Peninsula Digital Imaging (650)
967-1966
to download plans and specs click below.
(Carlmont HS
Plans & Specs)
|
|
BID DATE:
08/17/10
BID TIME:
2:00 P.M. |
Project:
Industrial Technology Ctr, Chabot College, Hayward
A three phased
approach to selective demo & construction for renovation of 2
(E) campus bldgs, hazardous remediation of int. finishes, a
small bldg. addition, new metal canopy structures & site
improvements incl. associated civil, arch, struc, plumbing, mech
& electrical work. Work involves a new bldg addition, concrete
foundations & slabs, masonry, plaster, electrical, low voltage
systems, new mech & plumbing systems, new finishes, adaptive
re-use & mod. Of selected areas, new cabinetry, accessibility
retrofits, selected re-roofing, paving, expanded infrastructure
utilities & extensive renovations.
EST: $4.2
MM Approx.
Duration:
312 Days |
Plans & Specs:
Available for
purchase @ Ford Graphics
(510) 451-9060
to download plans and specs click below:
(Industrial Tech Ctr Plans & Specs) |
REWARD
|
|
A Chance To Do Business With:
RALPH
LARSEN & SON, INC., GENERAL CONTRACTORS
300
8th Avenue, San Mateo, California 94401-4221,
Phone: (650) 579-0339
Please fax all bids to:
(650) 579-0349
License No.: 189341
|
|
Subcontractors submitting bids
may require bonding. We
will assist qualified M/W/S/L/D/DVBE subcontractors in obtaining the
required bonds, lines of credit & insurance.
Please let us know if you require such assistance no
later than 10 days prior to bid. |
|
WE
ARE AN EQUAL OPPORTUNITY EMPLOYER |
|
Copyright
© 2000 - 2006 Ralph Larsen & Son, Inc. All Rights
Reserved.
Last modified:
Thursday July 29, 2010 06:11 PM
|
|