Current Projects Out To Bid
WANTED
QUOTATIONS REQUESTED FROM ALL QUALIFIED M/W/S/L/D/DVBE SUBCONTRACTORS & SUPPLIERS
BID DATE:
03/11/10
BID TIME:
2:00 P.M.
Project: San Miguel ES Add'n /Renovation, Sunnyvale
Construction of (N) multi-use building & 2 kindergarten classrooms & associated site work. Alterations to bldgs & associated site work incl. civil, landscape, electrical, mechanical, plumbing & fire alarm. Construction of (N) covered walkways, (N) on-site fire hydrant.
MULTI PHASED PROJECT
EST: $10.6 MM Complete: 08/02/13
Plans & Specs:
Available for purchase from San Jose Blue
Ph: (408) 295-5770
Voucher required from Aedis Architects
Ph: (408) 264-2000
BID DATE:
03/12/10
BID TIME:
4:00 P.M.
Project: San Antonio ES Ph. 1, San Jose
42,000 sf of school w/a 2 story classroom bldg., a multi-purpose bldg., an admin bldg., a kindergarten bldg, & related site work.
all subbids over $100k must include cost of performance bond
This is a trade contract
We are bidding the Framing pkg. only
EST: $17 MM (total)
Duration: 6/15/10 to 8/15/11
Plans & Specs:
Available for purchase
Peninsula Digital Imaging
Ph: (650) 967-1966
BID DATE:
03/15/10
BID TIME:
2:00 P.M.
Project: John Muir MS Heating & Roofing, San Leandro
Upgrade HVAC system & roofing replacement throughout whole campus. Replace mechanical units in 7 buildings on the campus & associated re-roofing, structural, mechanical, plumbing, electrical and fire alarm work.
PROJECT STABILIZATION AGREEMENT IN EFFECT
EST: $3 MM Approx. Duration: 2 Mos.
Plans & Specs:
Available for purchase from Graphic Reproductions
Ph: (925) 674-0900
BID DATE:
03/16/10
BID TIME:
3:00 P.M.
Project: Orchard City Banquet Hall Renovation & Addition, Campbell Community Center
Construction renovation & addition to (E) one story bldg. to provide multi-function assembly space for Campbell Community Center.
EST: $1.7-$2.1 Approx. Duration: 300 Days
Plans & Specs:
$100 Non-Refundable
Peninsula Digital Imaging
Ph: (650) 967-1966
BID DATE:
03/18/10
BID TIME:
2:00 P.M.
Project: Lakewood ES Sitework & Admin Renovation, Sunnyvale
Site work associated with (N) media center bldg & partial renovation of the administration building, staff lounge & program rooms.
http://www.box.net/shared/gznr355ljq
EST: $1.1MM Complete: 12/17/10
Plans & Specs:
Available for purchase from San Jose Blue
Ph: (408) 295-5770
Voucher required from Aedis Architects
Ph: (408) 264-2000
BID DATE:
03/18/10
BID TIME:
2:00 P.M.
Project: San Leandro HS Career Tech Ctr., San Leandro
Renovation of (E) trade shops building housing auto, wood & metal shops as well as classroom & instructional spaces. Scope includes, but not limited to seismic retrofit, sprinkler installation, roofing, electrical upgrades, painting, restroom renovations, window replacements, new shop equipment, fencing & paving.
PROJECT STABILIZATION AGREEMENT IN EFFECT
EST: $6.2 MM Complete: 07/15/12
Plans & Specs:
Available for purchase from Graphic Reproductions
Ph: (925) 674-0900
BID DATE:
03/18/10
BID TIME:
2:00 P.M.
Project: Cunha Intermediate School, Bldg. D, Half Moon Bay
Interior construction of finishes, cabinetry, int. non-structural partitions, mechanical & electrical provisions, removal of structural partitions will require temporary shoring. Installation of new lockers, upgrade to electrical & mechanical utilities, installation of toilet rooms, some ext. plaster & waterproofing may be required.
EST: $1.7 MM Approx. Duration: 40 Days
Plans & Specs:
Available for purchase from San Jose Blue
Ph: (408) 295-5770
Voucher required from Aedis Architects
Ph: (408) 264-2000
BID DATE:
03/23/10
BID TIME:
1:00 P.M.
Project: San Leandro HS Restroom Renovation, San Leandro
Scope limited to selective accessibility improvements and upgrades to (E) student and staff restrooms in the following bldgs. Academics (Bldg. A & E), gymnasium, (Bldg B), Science (Bldg. S) & Pool (Bldg. D).
PROJECT STABILIZATION AGREEMENT IN EFFECT
EST: $1.2 MM Complete: 08/15/12
Plans & Specs:
Available for purchase from Graphic Reproductions
Ph: (925) 674-0900
BID DATE:
03/23/10
BID TIME:
2:00 P.M.
Project: Garfield & Monroe ES Restroom Renovation, San Leandro
Upgrading & meeting ADA compliance w/new finishes & fixtures in 25 toilet rooms & incl. asbestos & lead abatement, general demolition, concrete, wood framing, sheetrock, painting, tile, plumbing, mechanical & electrical work
PROJECT STABILIZATION AGREEMENT IN EFFECT
EST: $590K Complete: Aug. 18, 2010
Plans & Specs:
Available for purchase from Graphic Reproductions
Ph: (925) 674-0900
BID DATE:
03/23/10
BID TIME:
2:00 P.M.
Project: Phys. Ed. Complex Addition, Bldg. 4100, Chabot-Las Positas College District, Hayward – RE-BID
Increment 1 – New 2 story fitness center complex & surrounding site work. Fitness center will house weight lifting equip. on ground floor & fitness equip. on 2nd floor. Work incl. locker rooms & restroom facilities. Increment 2 – landscape structures, fence, light poles & low voltage controls.
PROJECT STABILIZATION AGREEMENT IN EFFECT
EST: $5 to $10 Mil. Approx. Duration: 400 Days
Plans & Specs:
Available for purchase from Ford Graphics
Ph: (510) 451-9060
BID DATE:
03/24/10
BID TIME:
1:00 P.M.
Project: Palo Alto HS Relocatables, Palo Alto
Relocation of 16 modular bldgs
LABOR COMPLIANCE PROGRAM IN EFFECT
EST: $900K Approx. Duration: 53 Days
Plans & Specs:
$200 (Refundable)
Pay to Palo Alto Unified School District c/o
Peninsula Digital Imaging
Ph: (650) 967-1966
BID DATE:
03/24/10
BID TIME:
2:00 P.M.
Project: Gunn HS Relocatables, Palo Alto
Relocation of 26 modular bldgs & installation of OF restroom bldgs (Gunn HS)
LABOR COMPLIANCE PROGRAM IN EFFECT
EST: $1.1 MM Approx. Duration: 53 Days
Plans & Specs:
$200 (Refundable)
Pay to Palo Alto Unified School District c/o
Peninsula Digital Imaging
Ph: (650) 967-1966
BID DATE:
04/07/10
BID TIME:
1:00 P.M.
Project: Ley Va New Admin Bldg., San Jose
(N) admin. bldg containing offices, lounge room, conference room & restroom facilities and accessory spaces incl. mechanical, plumbing, electrical & fire alarm systems. Roof mounted photo voltaic panels, (N) mtl shade structure, site grading, underground, (N) visitor parking lot, new concrete & asphalt paving, planters, landscape, irrigation, new metal fence, demo.
EST: $5.6 MM Approx. Duration: TBD
Plans & Specs:
Available for purchase from San Jose Blue
Ph: (408) 295-5770
Voucher required from Aedis Architects
Ph: (408) 264-2000
BID DATE:
04/08/10
BID TIME:
2:00 P.M.
Project: California Theater, Phase 1, Pittsburg
Seismic strengthening of entire structure; partial rehab of bldg. incl. retail stores (shell only), offices, main entry, ticket booth & lobby; (N) storefronts & marquee; masonry, cement plaster, tile door & window rehab, disabled access & life safety improvements, incl. (N) accessible restrooms, elevator, lobby & (N) ext. ramp @ north alley, (N) mechanical, electrical, plumbing systems, complete new roofing; new fire protection.
EST: $4.9 MM Approx. Duration: 427 Days
Plans & Specs:
Available for purchase from the City of Pittsburg Engineering Department
65 Civic Avenue
Pittsburg, CA 94565
BID DATE:
04/15/10
BID TIME:
3:00 P.M.
Project: Digital Media Ctr @ The Tannery Ph. 2, Santa Cruz
Rehabilitation of two structures at the Tanyard Building and Beam House of the former Salz Tannery, approx. 27,480 sf. Both bldgs require structural, carpentry, concrete, electrical, plumbing & other associated work prior to their reuse.
EST: $4 -$6 MM Approx. Duration: TBD
Plans & Specs:
Available for purchase from San Jose Blue
21511 East Cliff Drive
Santa Cruz, CA 95062
Ph: (831) 476-3700
REWARD
A Chance To Do Business With:
RALPH LARSEN & SON, INC., GENERAL CONTRACTORS
300 8th Avenue, San Mateo, California 94401-4221, Phone: (650) 579-0339
Please fax all bids to: (650) 579-0349
License No.: 189341
Subcontractors submitting bids may require bonding. We will assist qualified M/W/S/L/D/DVBE subcontractors in obtaining the required bonds, lines of credit & insurance. Please let us know if you require such assistance no later than 10 days prior to bid.
WE ARE AN EQUAL OPPORTUNITY EMPLOYER
Copyright © 2000 - 2006 Ralph Larsen & Son, Inc. All Rights Reserved.
Last modified: Tuesday March 09, 2010 03:08 PM